Defects

What This Page Is For

Keep faults and their fixes documented until you have checked the outcome.

How To Use It

  1. Choose Add defect and describe exactly what is wrong.
  2. Link the room and trade and attach a clear photo.
  3. Record the rectification as work is carried out.
  4. Choose Verify rectification only after checking the completed fix.
  5. Review any owner cost before confirming it.

How It Connects

Defects can link to trades and rooms; confirmed owner costs feed the project spending view.

Site Supervisor Tips

  • Photograph the problem with a wide shot and a close-up.
  • Do not close a defect just because a trade says it is fixed; check the result.

General organisation tips only, not building or legal advice.