Defects
What This Page Is For
Keep faults and their fixes documented until you have checked the outcome.
How To Use It
- Choose Add defect and describe exactly what is wrong.
- Link the room and trade and attach a clear photo.
- Record the rectification as work is carried out.
- Choose Verify rectification only after checking the completed fix.
- Review any owner cost before confirming it.
How It Connects
Defects can link to trades and rooms; confirmed owner costs feed the project spending view.
Site Supervisor Tips
- Photograph the problem with a wide shot and a close-up.
- Do not close a defect just because a trade says it is fixed; check the result.
General organisation tips only, not building or legal advice.